From breakdown response to full plant installations, one experienced engineer sees your job through from survey to sign-off — keeping your production moving.
Fault finding, repairs, distribution boards, cable runs, and machine hook-ups. All work BS 7671 certified.
Bearings, motors, gearboxes, conveyors, pumps. Common spares carried — most breakdowns resolved same visit.
PLC programming, control panels, sensor integration. Systems built for the operators who use them.
Commercial and industrial LED retrofits. Free energy survey — most projects pay for themselves within 18 months.
Custom web dashboards connected to your PLC. Live OEE, fault tracking, and shift reports — no cloud, no subscriptions.
PPM schedules, SOP writing, Kaizen boards, and maintenance strategy for your production line.
No sales reps, no subcontractors. The person you speak to on the phone is the person who turns up on site and does the work.
We carry common spares in the van. Most mechanical breakdowns are resolved the same visit — no waiting days for parts to arrive.
BS 7671 qualified, ECS carded, IPAF licensed, and confined space trained. Full certification and documentation provided with every job.
Based in Glasgow with coverage across the Central Belt and all of Scotland. Short travel times mean faster response and lower callout costs.
On site, Lanarkshire / 2026
Engineering Support was founded to give manufacturers and industrial businesses direct access to an experienced, multi-skilled engineer — without the overhead of a large contractor. Our lead engineer, Bartosz Milewski, has worked across renewable energy plants, carbon manufacturing, and industrial production facilities, building the kind of cross-discipline experience that means faster diagnosis and fewer return visits.
More About Us
£50k saved vs. OEM full replacement quote.
“Always on site when they say they will be.”
Gary Lumsden
50% cut from factory lighting costs.
“Exactly what they promised.”
David Christie
On site in 2 hours from the initial call.
“That kind of response is why we've used them for years.”
John Wallace
Full OEE visibility in 2 weeks — at 10x less than SCADA.
“The machine now has better visibility than it ever had — even when it was new.”
Based in Glasgow — on site across the Central Belt, Edinburgh, Lanarkshire, Speyside, the Borders and the Highlands.
Emergency callouts and planned work — call now or request a quote online.